Ernest Ward Middle School
This facility, constructed for the Escambia County School District, is a new Middle school. During the first six months, Greenhut gave $100,000 that we had achieved in buyout and cost savings back to the School District so that those dollars could be spent on optional upgrades or other ECSD needs. The project was built on…
Read MorePensacola State College South Santa Rosa Campus
The first building of the Pensacola State College South Santa Rosa campus is a two-story, 37,000-sf facility. Pensacola State College committed to minimizing the environmental footprint of the project, and therefore early in the design, the college decided to register the project with the US Green Building Council with a goal to achieve LEED Silver…
Read MoreUWF Lab Annex
The University of West Florida Hal Marcus College of Science and Engineering Laboratory Annex is a 52,000 SF 3-story structure designed to provide a state-of-the-art teaching and research facility for their students and faculty. A total of 12 teaching labs were provided, consisting of 8 biology labs and 4 chemistry labs. Shell space for the…
Read More